電気自動車と電池は明日を拓く

記事詳細

日時
2017/11/14 10:30
記事タイトル
Abengoa to begin building municipal solid waste to fuels plant for Fulcrum
リンク
http://www.greencarcongress.com/2017/11/20171114-abengoa.html Abengoa to begin building municipal solid waste to fuels plant for Fulcrumへの外部リンク
記事詳細
14 November 2017
Abengoa has received Notice to Proceed on Fulcrum BioEnergy’s plant that will produce biofuels from Municipal Solid Waste (MSW) in the United States with gasification technology.
Abengoa will be responsible for the engineering, design, construction and commissioning of the project. The plant will be located in the State of Nevada and will have the capacity to produce 10 million gallons of biofuels per year, to be used in the aviation sector.
This also affords Abengoa an opportunity to strengthen its position in a market where aviation fuel demand continues to grow, and which also sees renewable alternatives taking on a more important role. This initiative provides a sustainable alternative for the large amount of MSW that is produced in the area each year, and which otherwise would be disposed of at a landfill site.
Abengoa has spent more than a year working on the preliminary engineering and procurement works in order to minimize possible risks during construction. The engineering, procurement and construction works are expected to begin immediately and are expected to take more than two years.

新しくコメントをつける

題名
ゲスト名
投稿本文
より詳細なコメント入力フォームへ

サイト内検索

検索オプション

スポンサードリンク

Amazon

フィード